$Colombia and Latin America - AXL. 2 in Oso Pardo...Morsa-1 initial CNE drill ...work over rig now on site - $Colombia and Latin America - InvestorVillage


$Colombia and Latin America
This is a semi-private group. You are free to browse messages, but you must be a member of this group to post messages. Join This Group

Group: $Colombia and Latin America   /  Message Board  /  Read Message

 
 






Keyword
Subject
Between
and
Rec'd By
Authored By
Minimum Recs
  
Previous Message  Next Message    Post Message    Post a Reply return to message boardtop of board
Msg  15549 of 15718  at  2/1/2023 8:35:19 AM  by

rckillco


 In response to msg 15548 by  rckillco
view thread

Re: AXL. 2 in Oso Pardo...Morsa-1 initial CNE drill ...work over rig now on site

This from AXL Twitter, I wonder if this workover is a result of meetings with ministry or was always planned...first I have heard of it.

https://twitter.com/corp_arrow/status/1620568988374663168?s=20&t=4AERgSPt-IOd2GYeQznmfw


Short History of Morsa-1 news releases
From CNE 2014

"The Morsa 1 well was spud on May 27, 2014 and reached a total depth of 5,944 feet measured depth (“ft md”) on June 19, 2014 with good oil and gas shows encountered while drilling through the primary Umir sandstone reservoir target. The well encountered a total of 66 feet (“ft”) of net oil pay in 2 separate sandstone reservoirs within the Tertiary Umir Formation with an average porosity of 17%. The Umir reservoir was perforated from 3,504 to 3,725 ft md and is currently flowing at a gross rate of 832 bopd (832 bopd net) of 25o API oil with 0.1% water cut and 160 thousand standard cubic feet of gas per day (“mscfpd”) using a progressive cavity pump (“PCP”) over the course of a 9 day flow period."



From AXL June 2021

Following the completion of a PCP pump change early during the week of June 21st , 2021, Arrow re-started production from the Morsa-1 well at the Oso Pardo Field, located on the Santa Isabel Block, Middle Magdalena Valley Basin in Colombia. As of June 22nd , the Morsa-1 well was flowing at a rate of approximately 392 barrels of oil per day, net to Arrow’s 100% W.I., of 22.90 API crude at zero water-cut. The Company expects this rate of flush production to stabilize in the coming months, at an expected rate of approximately 120 barrels of oil per day. Concurrent with the re-start of the Morsa-1 well, Arrow intends on re-starting production from the adjacent Oso Pardo-1 and Oso Pardo-2 wells in the coming days, and the Company expects combined production from these latter two wells to be approximately 50 barrels of oil per day







     e-mail to a friend      printer-friendly     add to library      
|  
Recs: 2  
   Views: 0 []
Previous Message  Next Message    Post Message    Post a Reply return to message boardtop of board




Financial Market Data provided by
.
Loading...