AES Corp. Places Order for 48 Wind Turbines from Vestas | AES Message Board Posts


AES   /  Message Board  /  Read Message

 

 






Keyword
Subject
Between
and
Rec'd By
Authored By
Minimum Recs
  
Previous Message  Next Message    Post Message    Post a Reply return to message boardtop of board
Msg  20 of 21  at  12/30/2022 1:44:11 PM  by

jerrykrause


AES Corp. Places Order for 48 Wind Turbines from Vestas

Energy Monitor Worldwide
 

AES Corp. Places Order for 48 Wind Turbines from Vestas

 
 

Vestas has received a 216 MW order for wind turbines from The AES Corp. to power the Chevelon Butte Wind Farm Phase 2 in Arizona. The order consists of 48 V150-4.5 MW turbines. This project is the second and final phase of the collective Chevelon Butte Wind Farm. Chevelon Butte I is expected to be fully operational in the second quarter of 2023.

The order includes supply, delivery and commissioning of the turbines, as well as a 10-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimized performance of the asset.

Located on one of the oldest working cattle ranches in Arizona, the Chevelon Butte Wind Farm is a great example of how the renewable energy and ranching industries can coexist and collaborate to ensure long-term economic stability, says Laura Beane, president of Vestas North America. We are thrilled to meet AES turbine needs for this project and expand Vestass industry-leading 4 MW technology footprint in the USA.

Turbine delivery begins in the third quarter of 2023 with commissioning scheduled for early 2024.

 


     e-mail to a friend      printer-friendly     add to library      
|  
Recs: 0  
   Views: 0 []
Previous Message  Next Message    Post Message    Post a Reply return to message boardtop of board




Financial Market Data provided by
.
Loading...